Village of Palmetto Bay building permits
Village of Palmetto Bay issues its own building permits. Their folio numbers start with 33.
Last checked September 23, 2026
How a permit moves through Village of Palmetto Bay
Where the application starts
Online portalThe Village’s own words: the permit application, along with other required plans and/or documents, may be uploaded electronically to our system. Every contractor must register on the portal before applying.
Open Palmetto Bay permit application (GovOutreach)Source: Village of Palmetto Bay — Apply for a Building Permit · checked September 22, 2026
Where plans and documents go
Online portalPlans and documents are uploaded in the same portal, after creating a user account.
Open Palmetto Bay permit application (GovOutreach)Source: Village of Palmetto Bay — Apply for a Building Permit · checked September 22, 2026
Status and corrections
Online portalThe Village publishes an Online Permit Search running on Eden. On corrections its own words are: once the architect or engineer of record has addressed the issues and highlighted the corrections, the plans must be resubmitted for a second review; the contact person named on the application is called when the permit is issued.
Open Palmetto Bay Online Permit SearchSource: Village of Palmetto Bay — Permit Forms & Documents · checked September 19, 2026
What Village of Palmetto Bay asks for
Village of Palmetto Bay publishes submittal requirements for these 20 permit types:
- Roof
- Fence
- Window door residential
- Window door commercial
- Pool
- Demolition
- Generator
- Driveway approach
- Garage door residential
- Garage door commercial
- Screen enclosure
- Prefabricated shed
- Stucco siding
- Pool resurfacing
- Tent sales
- Trusses shop drawings
- Tco tcc
- Certificate of occupancy
- Ac replacement changeout
- Sign
- Village of Palmetto Bay — Roof Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Fence Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Windows & Doors Package, Residential (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Pool Permit Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Demolition Procedures (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Generator Package · read September 22, 2026
- Village of Palmetto Bay — Driveway/Approach Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Overhead Sectional/Roll-Up (Garage) Doors, Residential and Commercial Packages · read September 22, 2026
- Village of Palmetto Bay — Windows & Doors Package, Commercial · read September 22, 2026
- Village of Palmetto Bay — Screen Enclosure Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Pre-Fabricated Shed Package · read September 22, 2026
- Village of Palmetto Bay — Stucco/Siding Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Pool Resurfacing Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Tent Sales Package · read September 22, 2026
- Village of Palmetto Bay — Shop Drawings Review: Trusses Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — TCO/TCC Package and Application for Certificate of Occupancy or Completion · read September 22, 2026
- Village of Palmetto Bay — Air Conditioning Replacement/Change Out Package (Nov 2024) · read September 22, 2026
- Village of Palmetto Bay — Sign Permit Package (Nov 2024) · read September 22, 2026
Fees
Village of Palmetto Bay’s fee schedule: Village of Palmetto Bay — Code of Ordinances, Appendix A, Fee Schedule, effective As amended through Ord. No. 2019-02, 14 March 2019 (Village Code of Ordinances, Appendix A).
Fees are paid to Village of Palmetto Bay through Village of Palmetto Bay Cashier — online, in person at Village Hall, or by post.
Official forms
6 forms from Village of Palmetto Bay’s own forms index. PermitNex can fill all of them from your project details.
- Building Permit Application (2026)We fill this
Village of Palmetto Bay building, trade and specialty permits.
rev. May-26
- Miami-Dade Notice of CommencementWe fill this
Construction Lien Law.
- Change of ContractorWe fill this
Changing the contractor on a permit.
- Roof PackageWe fill this
Roofing permits.
- Fence PackageWe fill this
Fence permits.
- Swimming Pool Permit PackageWe fill this
Swimming pool permits.
County reviews may also apply: County guide.
Contact
- Office
- Village of Palmetto Bay Building & Permitting Division
- Phone
- 305-259-1250
- permits@palmettobay-fl.gov
- Address
- 9705 East Hibiscus Street, Palmetto Bay, FL 33157
- Hours
- Monday–Friday 7:30 a.m.–4 p.m., closed 12–1 p.m.
Source: Village of Palmetto Bay — Contact information & hours of operation · checked September 22, 2026
Get a Village of Palmetto Bay permit package ready before you file
Includes guided submission to Village of Palmetto Bay.
Not affiliated with Village of Palmetto Bay. Filing through PermitNex always needs your authorization; confirm requirements before you file. Out of date? Tell us.